ZHANG Zhiying, LI Chuan. Forming and scheduling of virtual flow lines for hull manufacturing in Shipbuilding[J].Industrial Engineering Journal, 2010,13(1): 58-63(in Chinese).[张志英,李川.面向船体曲面分段建造的虚拟流水线生产调度[J].工业工程,2010,13(1):58-63.]
[2]
LIU Lin, GU Hanyu, XI Yugeng. Rescheduling algorithm based on rolling horizon decomposition for a dynamic job shop with uncertain arriving time [J]. Chinese Journal of Mechanical Engineering, 2008,44(5):69-75(in Chinese).[刘琳,谷寒宇,席裕庚.工件到达时间未知的动态车间滚动重调度[J].机械工程学报,2008,44(5):69-75.]