全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

Frequency Reserve Within Unit Commitment Considering Spinning Reserve Uncertainty

DOI: 10.5923/j.ijee.20120204.10

Keywords: Frequency Deviation, GAMS, Load Ramp Rate, MINLP, Primary Reserve, Simultaneous Scheduling, Spinning Reserve Probability

Full-Text   Cite this paper   Add to My Lib

Abstract:

Various technical limitations of generating units and ancillary services requirements have more complicated the power generation control and operation. This paper introduces a novel methodology for day-ahead unit commitment, which is a crucial challenge in restructured power systems, considering primary frequency control reserve. In addition, also spinning reserve uncertainty as a practical constraint has been taken into account. In this paper, we formulate and solve simultaneous scheduling of energy and primary reserve as a mixed integer non linear programming problem that simultaneously accounts aforementioned constraints. In proposed formulation, system frequency is allowed to fall from nominal value to a critical specified limit.Finally, the proposed approach is implemented to the scheduling of a 17-unit isolated power system over 24-hours. Case studies and numerical results present significant outcomes and verify the robustness of the proposed method, while it creates a schedule consistent with the primary frequency control and spinning reserve uncertainty.

Full-Text

comments powered by Disqus

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133