全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

BUFFER SIZING FOR THE CRITICAL CHAIN PROJECT MANAGEMENT METHOD

Full-Text   Cite this paper   Add to My Lib

Abstract:

ENGLISH ABSTRACT: Methods for sizing project and feeding buffers for critical chain project management are investigated. Experiments indicate that – in the absence of bias, and for certain classes of bias – buffer consumption is independent of the mean duration of a chain. Generally the popular method – a buffer size equal to 50% of the longest path leading to it – gives rise to excessively large buffers. Buffers sized according to the square root of the sum of squares perform well in the absence of bias, but with bias present the performance is unacceptably poor. A new approach to buffer sizing is proposed. AFRIKAANSE OPSOMMING: Metodes vir groottebepaling van projek- en saamvloeibuffers vir kritieke-ketting projekbestuur word ondersoek. Eksperimente dui daarop dat – in die afwesigheid van onewewigtigheid, en vir sekere tipes onewewigtigheid – bufferverbruik onafhanklik is van die gemiddelde lengte van ’n ketting. Oor die algemeen veroorsaak die metode van buffergrootte – gelyk aan 50% van die langste pad wat tot die buffer lei – onnodige groot buffers. Buffers bepaal met die metode van die vierkantswortel van die som van kwadrate, vaar goed in die afwesigheid van onewewigtigheid, maar vaar onaanvaarbaar swak wanneer onewewigtigheid teenwoordig is. ’n Nuwe metode vir die bepaling van buffergrootte word voorgestel.

Full-Text

Contact Us

[email protected]

QQ:3279437679

WhatsApp +8615387084133