全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

Specially Structured n-Job 2-machine Flow Shop Scheduling Model With Break-Down Interval And Weightage Of Jobs

Keywords: Specially structured Flow shop , scheduling processing time , weights of jobs , break-down interval , rental policy.

Full-Text   Cite this paper   Add to My Lib

Abstract:

This Paper deals with a specially structured n-jobs 2- machine flow shop scheduling problem under specified rental policy in which processing times are associated with their respective probabilities including breakdown interval and weightage of job. Further jobs are attached with weights to indicate their relative importance. The objective is to find an algorithm to minimize the rental cost of the machine under Specified rental policy. The method is illustrated with the help of numerical example.

Full-Text

comments powered by Disqus

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133

WeChat 1538708413