全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

Just in Time Strategy in Balancing of Two-Sided Assembly Line Structure

DOI: 10.7763/ijmmm.2013.v1.14

Keywords: Assembly line , estimation of final results , just in time strategy , two-sided assembly line structure.

Full-Text   Cite this paper   Add to My Lib

Abstract:

In this paper a problem of two-sided assembly line balancing problem and Just in Time strategy is considered. Problem of assigning tasks to assembly line is known more than 60 years. Different balances occur in different quality of final results. Smoothness index (SI), time of line (LT) and line efficiency (LE) help to estimate the ends solutions. Additionally detailed idle times are described. In production systems products are assembled in required quantity directly to the market. One of the critical elements in Just in Time strategy is smooth flow production process. Author tries to connect assembly line balancing problem with this strategy. A numerical example is calculated and conclusions are presented.

Full-Text

comments powered by Disqus

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133

WeChat 1538708413