全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

Hydrology of Saco da Fazenda, Itajaí, SC Hidrologia do Saco da Fazenda, Itajaí, SC

Full-Text   Cite this paper   Add to My Lib

Abstract:

The Saco da Fazenda (SF) is a semi-enclosed coastal water body artificially made and inserted in the urban scenario of Itajaí city. The SF was created from the enterprise of retification of the access channel to the Port of Itajaí. The last curvature of the lower estuary was isolated from the main channel, and then creating the SF. Nowadays it is a depositional basin for the sediments from the Itajaí-A u River and from small streams which drains the Itajaí City downtown. These small streams flow to the SF with no treatment at all, and, consequently, the water quality is low. Applying basic morphological data and hydrographic data from the SF and the lower Itajaí-A u estuary, it was estimated the flushing time of the SF and the exchange level between the SF and the lower estuary. The flushing time is basically function of the tidal prism exchange, and the half-live was estimated as of the order of ‘few days’, or specifically 0,8 to 2,6 days varying the tidal height of neap and spring tide, respectivelly. The salinity of the SF the same of the upper layer of the lower estuary, and varies inversely and non-linearly related to the Itajaí-A u river discharge, indicating higher level of eschange between them. The Saco da Fazenda (SF) is a semi-enclosed coastal water body artificially made and inserted in the urban scenario of Itajaí city. The SF was created from the enterprise of retification of the access channel to the Port of Itajaí. The last curvature of the lower estuary was isolated from the main channel, and then creating the SF. Nowadays it is a depositional basin for the sediments from the Itajaí-A u River and from small streams which drains the Itajaí City downtown. These small streams flow to the SF with no treatment at all, and, consequently, the water quality is low. Applying basic morphological data and hydrographic data from the SF and the lower Itajaí-A u estuary, it was estimated the flushing time of the SF and the exchange level between the SF and the lower estuary. The flushing time is basically function of the tidal prism exchange, and the half-live was estimated as of the order of ‘few days’, or specifically 0,8 to 2,6 days varying the tidal height of neap and spring tide, respectivelly. The salinity of the SF the same of the upper layer of the lower estuary, and varies inversely and non-linearly related to the Itajaí-A u river discharge, indicating higher level of eschange between them.

Full-Text

comments powered by Disqus

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133

WeChat 1538708413