全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

From Tucuruí to Belo Monte: the history really progresses?

Keywords: Tucuruí , Tocantins River , Belo Monte , Xingu River , Hydroelectric dams , Electric power

Full-Text   Cite this paper   Add to My Lib

Abstract:

The essay reflects on the construction of the Tucuruí Hydroelectric Power Plant, in the Tocantins River, Brazil, and compares it to the Belo Monte plant, currently being raised on the Xingu River. The first was planned and built during the military dictatorship in Brazil (1964-1985) and the second, during a period considered democratic. The author criticizes the lack of transparency and the evidences of corruption in the history of Tucuruí, problems that seem to rise again with Belo Monte, thirty years later. He concludes that the federal government, responsible for both works, continues to disregard the adverse effects of large infrastructure projects in the Amazon.

Full-Text

Contact Us

[email protected]

QQ:3279437679

WhatsApp +8615387084133