Resource Use of Wind Farms in the German North Sea—The Example of Alpha Ventus and Bard Offshore I

DOI: 10.3390/resources2040504

Keywords: resource efficiency, resource use, material input per service (MIPS), wind energy, grid connection

Full-Text   Cite this paper   Add to My Lib

Abstract:

The German government aims to obtain at least 40 percent of its electricity from renewable sources by 2030. One of the central steps to reach this target is the construction of deep sea offshore wind farms. The paper presents a material intensity analysis of the offshore wind farms “Alpha Ventus” and “Bard Offshore I” under consideration of the grid connection. An additional onshore scenario is considered for comparison. The results show that offshore wind farms have higher resource consumption than onshore farms. In general, and in respect to the resource use of other energy systems, both can be tagged as resource efficient.

References

[1]  Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU). Renewable Energy Sources in Germany—Key Information 2012 at One Glance. Available online: http://www.erneuerbareenergien.de/fileadmin/Daten_EE/Dokumente__PDFs_/20130328_hgp_e_tischvorlage_2012_bf.pdf (accessed on 22 April 2013).
[2]  Nitsch, J.; Pregger, T.; Scholz, Y.; Naegler, T.; Heide, D.; de Tena, D.L.; Trieb, F.; Scholz, Y.; Nienhaus, K.; Sterner, M.; et al. Langfristszenarien und Strategien für den Ausbau der Erneuerbaren Energien in Deutschland bei Berücksichtigung der Entwicklung in Europa und Global; Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU): Berlin, Germany, 2012; pp. 308–309.
[3]  KPMG. Offshore-Windparks in Europa—Marktstudie 2010. Available online: http://offshore-stiftung.com/Offshore/61/61/60005/cbc31c0daa68cd7d1cffdfa6e365ca39/download.html (accessed on 28 August 2013).
[4]  Wagner, H.-J.; Baack, C.; Eickelkamp, T.; Epe, A.; Kloske, K.; Lohmann, J.; Troy, S. Die ?kobilanz des Offshore-Windparks alpha ventus; LIT Verlag: Berlin, Germany, 2010.
[5]  Wiesen, K. Ermittlung von Ressourceneffizienzpotenzialen der regenerativen Stromerzeugung durch Windenergie und Biomasse in Deutschland. Master’s Thesis, HAWK G?ttingen, G?ttingen, Germany, May 2010.
[6]  Teubler, J. ?kologische Betrachtung eines Offshore-Windparks unter Berücksichtigung der Netzintegration mit einer Hochspannungsgleichstromübertragung. Ph.D. Thesis, HAW Hamburg, Hamburg, Germany, May 2011.
[7]  Repower Systems. 5M, The 5-Megawatt Power Plant with 126 Metre Rotor Diameter. Product Brochure. Available online: http://www.repower.de/fileadmin/download/produkte/RE_PP5M_uk.pdf (accessed on 28 August 2013).
[8]  Schmidt-Bleek, F.; Bringezu, S.; Hinterberger, F.; Liedtke, C.; Spangenberg, J.; Stiller, H.; Welfens, M.J. MAIA Einführung in die Material-Intensit?ts-Analyse nach dem MIPS Konzept, 1st ed. ed.; Birkh?user: Berlin, Germany, 1998.
[9]  Ritthoff, M.; Rohn, H.; Liedtke, C. Calculating MIPS—Resource Productivity of Products and Services, 1st ed. ed.; Wuppertal Institute for Climate, Environment and Energy: Wuppertal, Germany, 2002.
[10]  Lettenmeier, M.; Rohn, H.; Liedtke, C.; Schmidt-Bleek, F. Resource Productivity in 7 Steps—How to Develop Eco-Innovative Products and Services and Improve their Material Footprint, 1st ed. ed.; Wuppertal Institute for Climate, Environment and Energy: Wuppertal, Germany, 2009.
[11]  Wuppertal Institute. Material Intensity Factors—Overview on Materials, Fuels, Transport Services and Food. Available online: http://wupperinst.org/en/info/details/wi/a/s/ad/365/ (accessed on 22 April 2013).
[12]  Tryfonidou, R. Energetische Analyse eines Offshore-Windpars unter Berücksichtigung der Netzintegration. Ph.D. Thesis, University Bochum, Bochum, Germany, December 2006.
[13]  Pick, E.; Wagner, H.J. Beitrag zum kumulierten Energieaufwand ausgew?hlter Windenergiekonverter; Working Report for University GH Essen: Essen, Germany, 1998.
[14]  Fraunhofer IWES. Alpha ventus: Forschung und Industrie pr?sentieren gemeinsame Erfolge. Available online: http://www.iwes.fraunhofer.de/de/Presse-Medien/Pressemitteilungen/2012/alpha_ventus_forschungundindustriepraesentierengemeinsameerfolge.html (accessed on 22 April 2013).
[15]  Hughes, G. The Performance of Wind Farms in the United Kingdom and Denmark; Renewable Energy Foundation: London, UK, 2012.
[16]  Gering, D.; Meyer, J. Transpower stromübertragungs gmbh. Erfahrungen bei der Planung und dem Bau des Netzanschlusses alphaventus. In Proceedings of Husum Wind 2010 Conference, Husum, Germany, 21–25 September 2010.
[17]  Repower. In RE5M, Massenübersicht: Zusammenfassung (Confidential); Repower Systems AG: Hanburg, Germany, 2005.
[18]  Bethke, D.; AMBAU GmbH Stahl—Und Anlagenbau, Werk Bremen, Bremen, Germany. 2009.
[19]  Gute Nachbarschaft in Cuxhaven. In BARD Magazin, 12th ed. ed.; BARD Engineering GmbH: Emden, Germany, 2010.
[20]  Braun, T.; WeserWind GmbH Offshore, Bremerhaven, Germany. 2009.
[21]  Wiese, L. Informationen, 04/2009, Deutsches Offshore-Testfeld und Infrastruktur GmbH & Co. KG, Oldenburg, Germany, April, 2009.
[22]  Moeller, M. Team Leader Assembly and Construction; Cuxhaven Steel Construction GmbH: Cuxhaven, Germany, 2011.
[23]  Zschoge, F.; AREVA Energietechnik GmbH, T&D Systems, Dresden, Germany. 2009.
[24]  Harthun, J.; Director Entwicklung und Konstruktion at AREVA Werk Transformatoren, M?nchen-Gladbach, Germany. 2009.
[25]  Harland & Wolff. BARD Offshore Transformer Completed; Harland and Wolff Heavy Industries Ltd: Queen’s Island, UK, 2010.
[26]  Waldhofer, T. Langstreckentransport von Offshore-Strom—Technische L?sungen und wirtschaftliche Betrachtungen; ABB Group: Zürich, Switzerland, 2010.
[27]  ABB Ltd. Environmental Product Declaration—Power Transformer 250 MVA. Transmissione & Distribuzione S.p.A. Available online: http://www05.abb.com/global/scot/scot292.nsf/veritydisplay/e7c381463152c60bc1256de900407090/$file/PT%20250%20MVA.pdf (accessed on 27 Septemper 2013).
[28]  Beigert, M.; Norddeutsche Seekabelwerke GmbH (NSW), Nodenham, Germany. 2009.
[29]  Worzyk, T. Submarine Power Cables—Design Installatin, Repair, Environmental Aspects, 1st ed. ed.; Springer Verlag: Berlin Heidelberg, Germany, 2009.
[30]  G??wein, J.; Repower Systems AG, Hamburg, Germany. 2009.
[31]  Pein, K.; SAG GmbH, Berlin, Germany. 2010.
[32]  Website of Deutsche Energie-Agentur GmbH (DENA). Available online: http://www.offshore-wind.de/page/index.php?id=4761 (accessed on 5 August 2012).
[33]  Samus, T.; Lang, B.; Rohn, H. Assessing the natural resource use and the resource efficiency potential of the Desertec concept. Sol. Energy 2013, 87, 176–183, doi:10.1016/j.solener.2012.10.011.
[34]  Rohn, H.; Wiesen, K.; Lettenmeier, M.; Pastewski, N. Sustainability through Innovative Technologies, Products and Strategies with High Resource Efficiency Potentials. Results from current research studies in Germany. In Proceedings of the Conference of the European Roundtable on Sustainable Consumption and Production (ERSCP) & Conference of the Environmental Management for Sustainable Universities (EMSU) “Knowledge Collaboration & Learning for Sustainable Innovation”, Delft, The Netherlands, 25–29 October 2010; p. 17. ISBN 978-90-5155-065-8.
[35]  KRESSE project, Wuppertal Institute. Available online: http://wupperinst.org/en/projects/details/wi/p/s/pd/38/ (accessed on 24 September 2013).
[36]  OFFSHORE-WINDENERGIE.NET Homepage. Available online: http://www.offshore-windenergie.net/en/wind-farms (accessed on 24 September 2013).

Full-Text

comments powered by Disqus

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133

WeChat 1538708413