Investigation of Contemporary Performance Measurement Systems for Production Management of Renovation Projects

DOI: 10.1155/2014/417853

Full-Text   Cite this paper   Add to My Lib

Abstract:

Renovation projects exhibit complex characteristics due to the presence of constraints that lead to cost and schedule overruns. Numerous researchers have concluded that the performance of renovation projects is typically lower than that of new construction projects. This paper discusses the initial phases of a research conducted at Michigan State University, which focused on developing a framework for production management of renovation projects. The emphasis of this paper is on the findings from literature review and interviews, pertinent to performance measurement in renovation projects that led to the framework development. However, the framework development and the framework itself have not been discussed. This paper primarily addresses two questions: (1) what are the complexities of renovation projects that lead to underperformance in cost, time, and quality? and (2) what are the limitations of state-of-the-art construction performance measurement systems for managing production in renovation projects? Interviews of 10 construction companies were conducted to identify current practices of production management in renovation projects. This research observed a lack of a formal production management process in renovation projects, with a limited use of performance measurement systems. The research identified essential attributes for avoiding schedule and cost overruns on renovation projects. 1. Introduction Renovation projects represent about one-third of the total expenditure spent on construction projects [1, 2]. In the late 1990s, a study conducted in the United States concluded that renovation projects including remodeling, reutilization, and rehabilitation constituted up to 50% of the total construction budget expended [3]. In the commercial and institutional sectors, the annual expenditure on renovation projects has increased from close to $20 billion in 1992 to approximately $120 billion in 2007 [4–7]. This increasing investment in renovation projects has been attributed to the growing needs of public owners and governmental institutions, which represent a major clientele for renovation projects, in order to maintain and upgrade their infrastructure and built facilities [8]. Moreover, renovation projects mostly offer an economically viable alternative for public owners in comparison to new construction, as multiphase renovation projects tend to eliminate the need to close owner’s operations during construction [2, 3]. While renovation projects are a growing sector of the construction industry, its performance is typically lower than that of new

References

[1]  P. Mitropoulos and G. A. Howell, “Renovation projects: design process problems and improvement mechanisms,” Journal of Management in Engineering, vol. 18, no. 4, pp. 179–185, 2002.
[2]  Y. Singh, A framework for production management of renovation projects [M.S. thesis], Construction Management, Michigan State University, 2007.
[3]  R. McKim, T. Hegazy, and M. Attalla, “Project performance control in reconstruction projects,” Journal of Construction Engineering and Management, vol. 126, no. 2, pp. 137–141, 2000.
[4]  U. S. Census Bureau, Commercial and Institutional Building Construction, Economic Census, 1992.
[5]  U.S. Census Bureau, Commercial and Institutional Building Construction 1997. Economic Census 1997.
[6]  U.S. Census Bureau, Commercial and Institutional Building Construction 2002, Economic Census, 2002.
[7]  U.S. Census Bureau, “Commercial and Institutional Building Construction 2007,” Economic Census 2007.
[8]  M. Attalla, T. Hegazy, and R. Haas, “Reconstruction of the building infrastructure: two performance prediction models,” Journal of Infrastructure Systems, vol. 9, no. 1, pp. 26–34, 2003.
[9]  T. Mrozowski, T. Abdelhamid, S. Schafer, et al., “Assessment and improvement of construction closeout at Michigan State University,” Tech. Rep., Center for Construction Project Performance Assessment and Improvement, Michigan State University, East Lansing, Mich, USA, 2008.
[10]  R. J. Krizek, L. Wei, and H. Ahmad, “Lessons learned from multiphase reconstruction project,” Journal of Construction Engineering and Management, vol. 122, no. 1, pp. 44–54, 1996.
[11]  Construction Management Association of America, Sixth Annual Survey of Owners, FMI, Management Consulting, USA, 2005, http://cmaanet.org/user_images/sixth_owners_survey.pdf.
[12]  C. Cain, Performance Measurement for Construction Profitability, Blackwell, Malden, Mass, USA, 2004.
[13]  S. Beatham, C. Anumba, and T. Thorpe, An Integrated Business Improvement System (IBIS) for Construction, Center for Innovative Construction Engineering (CICE), Loughborough University, Leicestershire, UK, 2003.
[14]  S. Beatham, C. Anumba, T. Thorpe, and I. Hedges, KPIs—A Critical Appraisal of Their Use in Construction, Center for Innovative Construction Engineering (CICE), Loughborough University, Loughborough, UK, 2003.
[15]  L. F. Alarcón, A. Grillo, J. Freire, and S. Diethelm, Learning from Collaborative Benchmarking in the Construction Industry, Chilean Chamber of Construction, Santiago, Chile, 2000.
[16]  M. Samson and N. M. Lema, Development of Construction Contractors Performance Measurement Framework, Department of Construction Technology and Management, University of Dar es Salaam, Dar es Salaam, Tanzania, 2002.
[17]  D. B. Costa, C. T. Formoso, M. Kagioglou, L. F. Alarcón, and C. H. Caldas, “Benchmarking initiatives in the construction industry: lessons learned and improvement opportunities,” Journal of Management in Engineering, vol. 22, no. 4, pp. 158–167, 2006.
[18]  E. Lantelme and C. T. Formoso, Improving Performance through Measurement: The Application of Lean Production and Organizational Learning Principles, Building Innovation Research Group (NORIE), Porto Alegre Rio Grande do Sul, Brazil, 2000.
[19]  T. Korde, M. Li, and A. D. Russell, State-Of-The-Art Review of Construction Performance Models and Factors, Department of Civil Engineering, University of British Columbia, Vancouver, Canada, 2004.
[20]  G. Ballard, Last planner system of production control [Doctoral thesis], University of Birmingham, May 2000.
[21]  V. K. Chitla and T. S. Abdelhamid, “Comparing process improvement initiatives based on percent plan complete and labor utilization factors,” in Proceedings of the 11th Annual Conference for Lean Construction, pp. 118–131, Blacksburg, Va, USA, July 2003.
[22]  S. Mubarak, Construction Project Scheduling and Control, Prentice Hall, 2004.
[23]  L. Koskela and G. Howell, “Reforming project management: the role of planning, execution, and control,” in Proceedings of 9th Annual Conference of the International Group for Lean Construction, Singapore, August 2001.
[24]  Y. Kim and G. Ballard, “Earned value method and customer earned value,” Journal of Constructio n Research, vol. 3, no. 1, pp. 55–66, 2002.
[25]  P. Mitropoulos, Planned Work Ready: A Proactive Metric for Project Control, Webb School of Construction, Arizona State University, 2003.
[26]  L. Koskela, “Management of production in construction: a theoretical view,” in Proceedings of the 7th Annual Conference of the International Group for Lean Construction (IGLC-7 '99), pp. 241–252, University of California, Berkley, Calif, USA, July 1999.
[27]  G. Ballard and G. Howell, “Shielding production: essential step in production control,” Journal of Construction Engineering and Management, vol. 124, no. 1, pp. 11–17, 1998.
[28]  E. W. Wayne and H. G. Irwig, “Disturbance scheduling technique for managing renovation works,” Journal of Construction Engineering and Management, vol. 114, no. 2, pp. 191–213, 1988.
[29]  N. Nassar, An Integrated Framework for Evaluation, Forecasting and Optimization of Performance of Construction Projects, University of Alberta, Alberta, Canada, 2005.

Full-Text

comments powered by Disqus

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133

WeChat 1538708413