考虑可控负荷停电成本的微电网经济调度策略
Microgrid Economic Dispatch Considering Outage Costs of Controllable Load

DOI: 10.12677/TDET.2015.44007, PP. 69-81

Keywords: 微电网,可控负荷,经济调度
Mircogrid
, Controllable Load, Economic Dispatch

Full-Text   Cite this paper   Add to My Lib

Abstract:

微电网中的负荷具有灵活而易于控制管理的特点。将负荷积极参与到微电网调度计划中,可以有效提高微电网运行的经济性。本文根据影响可控负荷停电成本的各要素,建立可控负荷停电成本模型,并将其与常见的微电网调度模型结合,制定了多时间尺度下的考虑可控负荷停电成本的微电网经济调度方案,有效地将可控负荷参与到微电网经济调度中。通过对其进行仿真分析,验证了该方法的合理性和有效性。
The loads in microgrid are flexible and easy to control. The economical operation of microgrid would become more economic by loads actively participating in. A cost model of controllable load was built based on factors affecting the outage costs. Combining it and the traditional microgrid operating model, a multi-time scale microgrid operating model was constructed, engaging controllable loads in the operation effectively. By simulation analysis, the rationality and validity of the model were proved.

References

[1]  习朋, 李鹏 (2011) 基于改进粒子群算法的微网经济负荷分配. 电气技术, 10, 7-10.
[2]  Chakraborty, S., Weiss, M.D. and Simoes, M.G. (2007) Distributed intelligent energy management system for a single- phase high-frequency AC microgrid. IEEE Transactions on Industrial Electronics, 54, 97-109.
http://dx.doi.org /10.1109/TIE.2006.888766
[3]  张颖媛 (2011) 微网系统的运行优化与能量管理研究. 硕士论文, 合肥工业大学, 合肥.
[4]  陈健, 王成山, 赵波, 等 (2012) 考虑储能系统特性的独立微电网系统经济运行优化. 电力系统自动化, 20, 25- 31.
[5]  曾鸣, 马少寅, 刘洋, 等 (2012) 基于需求侧响应的区域微电网投资成本效益分析. 水电能源科学, 7, 190-193.
[6]  Lau, R., Ayyorgun, S., Mau, S.C., et al. (2011) Strategy and modeling for building DR optimization. 2011 IEEE International Conference on Smart Grid Communications (SmartGridComm), Brussels, 17-20 October 2011, 381-386.
http://dx.doi.org /10.1109/SmartGridComm.2011.6102352
[7]  刘小聪, 王蓓蓓, 李扬, 等 (2013) 智能电网下计及用户侧互动的发电日前调度计划模型. 中国电机工程学报, 1, 30-38.
[8]  王建学, 王锡凡, 张显, 等 (2004) 电力市场和过渡期电力系统可中断负荷管理 (一)——可中断负荷成本效益分析. 电力自动化设备, 5, 15-19.
[9]  Balducci, P.J., Roop, J.M., Schienbein, L.A., et al. (2002) Electrical power interruption cost estimates for individual industries, sectors and US economy. Pacific Northwest National Laboratory.
http://dx.doi.org /10.2172/926127
[10]  陈浩珲 (2007) 引入激励与保障机制的可中断负荷合同研究. 硕士论文, 华北电力大学, 北京.
[11]  陈达威, 朱桂萍 (2011) 微电网负荷优化分配. 电力系统自动化, 20, 45-49.
[12]  王建学, 王锡凡, 王秀丽 (2005) 电力市场可中断负荷合同模型研究. 中国电机工程学报, 9, 11-16.

Full-Text

comments powered by Disqus

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133

WeChat 1538708413