Terzaghi K. Theoretical Soil Mechanics[M]. New York: Wiley,1943.
[2]
Christian J T. Geotechnical engineering reliability: How well do we know what we are doing?[J]. Journal of Geotechnical and Geoenvironmental engineering, 2004, 130(10): 985-1003.
[3]
Casagrande A. Role of the "calculated risk" in earthwork and foundation engineering[J]. Journal of the Soil Mechanics and Foundations Division, 1965, 1(91): 1-4.
[4]
Whitman R V. Evaluating calculated risk in geotechnical engineering[J]. Journal of Geotechnical Engineering,1984, 110(2): 143-188.
[5]
Morgan G C, Rawlings G E, Sobkowicz J C. Evaluating Total Risk to Communities From Large Debris Flows[M]. Vancouver BC: BiTech Publishers, 1992.
[6]
Fell R. Some Landslide risk zoning schemes in use in easter Australia and their application[C]//Australia andtheir application. Sixth Australian New Zealand Conference on Geomechanics,Christchurch, 1992: 505-512.
[7]
AGS. Landslide risk management concepts and guidelines[J]. Australian Geomechanics,2000,35(1):49-92.
[8]
Van Staveren M. Extending to geotechnical risk management[C]// ISGSR,First International Symposium on Geotechnical Safety & Risk. Shanghai:Tongji University press,2009: 1-12.
[9]
汪敏,张世文.香港地区岩土工程风险管理[J].工程勘察,2002(4):1-5. WANG Min,ZHANG Shiwen. Risk management of geotechnical engineering in HongKong[J]. Geotechnical Investigation & Surveying,2002(4): 1-5.(in Chinese)
[10]
Bernstein P L, Bernstein Peter L. Against the Gods: The Remarkable Story of Risk[M]. New York: Wiley, 1996:35-50.
[11]
张贵金,徐卫亚.岩土工程风险分析及应用综述[J].岩土力学.2005,26(9):1508-1516. ZHANG GuiJin,XU Weiya. Summary about risk analysis of geotechnical engineering and its application[J]. Rock and Soil Mechanics,2005, 26(9): 1508-1516.(in Chinese)
[12]
Fell R, Corominas J, Bonnard C, et al. Guidelines for landslide susceptibility, hazard and risk zoning for land-use Planning[J]. Engineering Geology, 2008, 102(3/4): 99-111.
[13]
Degn Eskesen S, Tengborg P, Kampmann J, et al. Guidelines for tunnelling risk management: international tunnelling association, working group No. 2[J]. Tunnelling and Underground Space Technology,2004, 19(3): 217-237.
[14]
路美丽,刘维宁,罗富荣,等.隧道与地下工程风险评估方法研究进展[J].工程地质学报,2006, 14(4): 462-469. LU Meili,LIU Weining,LUO Furong Luo, et al. Review on risk assessment methods for tunnelling and underground projects[J]. Journal of Engineering Geology, 2006, 14(4): 462-469..(in Chinese)
[15]
Bowles D S. Evaluation and Use of Risk Estimates in Dam Safety Decision Making[C]// Proceedings of the United Engineering Foundation Conference on Risk-Based Decision-Making in Water Resources IX, "20-Year Retrospective and Prospective of Risk-Based Decision-Making", Santa Barbara, California:American Society of Civil Engineers, 2001:1-14.
[16]
唐彦东.灾害经济学[M].北京:清华大学出版社, 2011.(in Chinese) TANG Yandong. The Economics of Disasters[M]. Beijing: Qinghua University Press, 2011.
[17]
Snel A, Van Hasselt D. Risk Management in the Amsterdam North/South Metro Line: A Matter of Process-Communication Instead of Calculation[C]// Proceedings of the World Tunnel Congress 99, 1999:179-186.
[18]
雷刚,华福才,郑广亮.层次分析法 (AHP) 在地铁隧道工程中的应用[J]. 地下空间与工程学报,2012, 8(A02): 1782-1787.(in Chinese) LEI Gang,HUA Fucai,ZHENG Guangliang. Application of the risk assessment method in metro tunnel projects based on AHP method[J]. Chinese Journal of Underground Space and Engineering,2012, 8(A02): 1782-1787.
[19]
何海鹰,胡甜,赵健.基于AHP的岩质高边坡风险评估指标体系[J].中南大学学报:自然科学版, 2012,43(7): 2861-2868. HE Haiying,HU Tian,ZHAO Jian. Risk Assessment Indexes System of High Rock Slope Based on AHP[J]. Journal of Central South University:Science and Technology,2012,43(7): 2861-2868.(in Chinese)
[20]
黄宏伟,朱琳,谢雄耀.上海地铁11号线关键节点工可阶段工程风险评估[J].岩土工程学报,2007,29(7): 1103-1107. HUANG Hongwei, ZHU Lin, XIE Xiongyao. Risk assessment on engineering feasibility of key events in Shanghai Metro Line No. 11[J]. Chinese Journal of Geotechnical Engineering,2007,29(7): 1103-1107.(in Chinese)
[21]
陈龙,黄宏伟.岩石隧道工程风险浅析[J].岩石力学与工程学报,2005,24(1): 110-115. ChEN Long,HUANG Hongwei. Risk analysis of rock tunnel engineering[J]. Chinese Journal of Rock Mechanics and Engineering,2005, 24(1): 110-115.(in Chinese)
[22]
陈伟,许强,王朝阳.蒙特卡洛法在滑坡稳定性可靠度分析中的应用[J].路基工程,2011,135(4): 135-137. CHEN Wei, XU Qiang, WANG Chaoyang. Application of monte carlo method in reliability analysis of slope stability[J]. Subgrade Engineering,2011,135(4): 135-137.(in Chinese)
[23]
王贵成,曹平,林杭,等.用灰色理论确定边坡最优监测点及安全系数[J].中南大学学报:自然科学版, 2007, 38(3): 574-578. WANG Guicheng,CAO Ping,LIN Hang,et al. Determination of optimum monitoring point of slope and safety factor using grey system theory[J]. Journal of Central South University: Natural Science,2007, 38(3): 574-578.(in Chinese)
[24]
夏元友,熊海丰.边坡稳定性影响因素敏感性人工神经网络分析[J].岩石力学与工程学报,2004, 23(16): 2703-2707. XIA Yuanyou,XIONG Haifeng. Sensibility analysis of slope stability based on artificial neural network[J]. Chinese Journal of Rock Mechanics and Engineering, 2004, 23(16): 2703-2707.(in Chinese)
[25]
陈斌,刘宁,卓家寿.岩土工程反分析的扩展贝叶斯法[J].岩石力学与工程学报,2004,23(4):555-560. CHEN Bin,LIU Ning,ZHUO Jiashou. Extended Baysian Method of inverse analysis in geoengineering[J]. Chinese Journal of Rock Mechanics and Engineering, 2004,23(4): 555-560.(in Chinese)
[26]
聂春龙.边坡工程风险分析理论与应用研究[D].长沙:中南大学,2012. NIE Chunlong. Risk Analysis Theory and Application for Slope Engineering[D]. Changsha: Central South University, 2012.(in Chinese)
[27]
张雷,王晓雪.边坡工程风险评估与风险因子比率分析[J].地下空间与工程学报,2009,5(2): 390-394. ZHANG Lei,WANG Xiaoxue. Risk assessment and risk ratios analysis for slope engineering project[J]. Chinese Journal of Underground Space and Engineering,2009,5(2): 390-394.(in Chinese)
[28]
汪丽,吴丽,陈礼仪.高边坡工程风险源指标体系的研究与构建[J].探矿工程:岩土钻掘工程, 2011,38(2):71-73. WANG Li,WU Li,CHEN Liyi. Reach and construction of risk source index system of high slope engineering[J]. Exploration Engineering: Rock & Soil Drilling and Tunneling, 2011,38(2): 71-73.(in Chinese)
[29]
Van Zyl D, Miller I, Milligan Vu, et al. Probabilistic Risk Assessment for Tailings Impoundment Founded on Paleokarst[C]// Uncertainty in the Geologic Environments from Theory to Practice, ASCE, 1996: 563-585.
[30]
Baecher G B, Christian J T. Reliability and Statistics in Geotechnical Engineering[M]. Chichester:John Wiley & Sons, 2005:5-58.
[31]
阮欣,尹志逸,陈艾荣.风险矩阵评估方法研究与工程应用综述[J].同济大学学报:自然科学版, 2013,41(3): 381-385. RUAN Xin,YIN Zhiyi,CHEN Airong. A review on risk matrix method and its engineering application[J]. Journal of Tongji University:Natural Science,2013,41(3): 381-385.(in Chinese)
[32]
Ho K, Leroi E, Roberds B. Quantitative risk assessment: application, myths and future direction[C]// Melbourne: Proceedings of the International Conference on Geotechnical Engineering,2000:269-312.
[33]
Clark G T, Borst A. Addressing Risk in Seattle’s Underground[J]. PB Network, 2002, 1: 34-37.
[34]
陈光齐,Zen K, Kasuya Y. 地震引起的边坡灾害风险评估[J].岩石力学与工程学报,2008, 27(12): 2488-2493. CHEN Guangqi,Zen K, Kasuya Y. Practical Risk Assessment of Slope Disaster and Induced by Earthquake[J]. Chinese Journal of Rock Mechanics and Engineering, 2008, 27(12): 2488-2493.(in Chinese)
[35]
陈光齐.地震引起的边坡灾害风险分析实用技术[J].岩石力学与工程学报,2008, 27(12): 2395-2402. CHEN Guangqi. Practical techniques for risk analysis of earthquake-induced landslide[J]. Chinese Journal of Rock Mechanics and Engineering,2008, 27(12): 2395-2402.(in Chinese)
[36]
曹云,徐卫亚.系统工程风险评估方法的研究进展[J].中国工程科学,2005,7(6):88-94. CAO Yun,XU Weiya. A review on the risk assessment methods of system engineering[J]. Chinese Engineering Science,2005, 7(6): 88-94.(in Chinese)
[37]
陈晓正,胡象明.重大工程项目社会稳定风险评估研究――基于社会预期的视角[J].北京航空航天大学学报:社会科学版,2013,26(2): 15-18. CHEN Xiaozheng,HU Xiangming. A study on social risk assessment of major projects: from the perspective of social expectation[J]. Journal of Beijing University of Aeronautics and Astronautics:Social Sciences Edition,2013,26(2): 15-18.(in Chinese)
[38]
杨琳,罗鄂湘.重大工程项目社会风险评价指标体系研究[J].科技与管理,2010,12(2):43-46. YANG Lin,LUO Exiang. Study on social risk indicator system for large project[J]. Science-Technology and Management,2010,12(2): 43-46.(in Chinese)
[39]
Faber M H, Stewart M G. Risk assessment for civil engineering facilities: critical overview and discussion[J]. Reliability Engineering & System Safety, 2003, 80(2): 173-184.
胡群芳,黄宏伟.隧道及地下工程风险接受准则计算模型研究[J].地下空间与工程学报,2006,2(1): 60-64. HUANG Qunfang,HUANG Hongwei. Study on the modeling of risk acceptance criteria for tunnel and underground engineering[J]. Chinese Journal of Underground Space and Engineering,2006, 2(1): 60-64.(in Chinese)
[42]
姚宣德,王梦恕.地下工程风险评估准则分析与研究[J].中国工程科学,2009,11(7):86-91,96. YAO Xuande,WANG Mengshu. Analysis and research for risk assessment criteria of underground engineering[J]. Chinese Engineering Science,2009, 11(7): 86-91, 96.(in Chinese)
[43]
Dai F C,Lee C F,Ngai, Y Y . Landslide risk assessment and management: an overview[J].Engineering Geology,2002,64(1):65-87.
[44]
Fell R. Landslide risk management concepts and guidelines-australian geomechanics society sub-committee on landslide risk management[J]. International Union of Geological Sciences,2000: 51-93.
[45]
尚志海,刘希林.国外可接受风险标准研究综述[J].世界地理研究,2010,19(3):72-80. SHANG Zhihai, LIU Xilin. Overviews on foreign acceptable risk criteria[J].World Regional Studies,2010,19(3):72-80.(in Chinese)
[46]
Fell R, Corominas J, Bonnard C, et al. Guidelines for landslide susceptibility, hazard and risk zoning for land use planning[J]. Engineering Geology,2008, 102(3): 85-98.
[47]
Nathwani J S,Lind N C,Pandey M D . The LQI standard of practice:optimizing engineered safety with the life quality index[J].Structure and Infrastructure Engineering,2008,4(5):327-334.
[48]
Straub D, Lentz A, Papaioannou I, et al. Life Quality Index for Assessing Risk Acceptance in Geotechnical Engineering[C]// ISGSR 2011- Vogt, Schuppener, Straub & Br?u ISGSR 2011-Vogt. Bundesanstalt für Wasserbau,2011:1-9.
[49]
李升.大坝安全风险管理关键技术研究及其系统开发[D].天津:天津大学,2012. LI Sheng. Key Technology Research and System Development of Dam Safety Risk Management[D].Tianjin: Tianjin University, 2012.(in Chinese)