程春田,李建兵,李刚.水电站分段调峰负荷分配方法研究与应用[J].水力发电学报,2011,30(2):38-43.Cheng Chuntian,Li Jianbing,Li Gang.Study of the method of partition load distribution in hydropower station and its application[J].Journal of Hydroelectric Engineering,2011,30(2):38-43(in Chinese).
[2]
武新宇,程春田,申建建,等.大规模水电站群短期优化调度方法Ⅲ:多电网调峰问题[J].水利学报,2012,43(1):31-42.Wu Xinyu,Cheng Chuntian,Shen Jianjian,et al.Short-term optimal operation methods of large-scale hydropower plants Ⅲ:solution method of peak load regulation for multiple power grid[J].Shuili Xuebao,2012,43(1):31-42(in Chinese).
[3]
王金文,范习辉,张勇传.大规模水电站系统短期调峰电量最大模型及其求解[J].电力系统自动化,2003,27(15):29-34.Wang Jinwen,Fan Xihui,Zhang Yongchuan.Short-term generation scheduling for the peak-energy maximization of large-scale hydropower systems[J].Automation of Electric Power Systems,2003,27(15):29-34(in Chinese).
[4]
刘长义,韩放,于继来,等.互联电网的调峰调频和联络线调整[J].电网技术,2003,27(4):36-38.Liu Changyi,Han Fang,Yu Jilai,et al.Study on peak load,frequency and tie-line power flow regulation of interconnected power system[J].Power System Technology,2003,27(4):36-38(in Chinese).
[5]
李明宇,王坚.南方电网调峰形势、问题与对策[J].南方电网技术,2014,8(2):69-72.Li Mingyu,Wang Jian.The situation,problems and measures of load regulation in China Southern power grid[J].Southern Power System Technology,2014,8(2):69-72(in Chinese).
廖胜利,程春田,蔡华祥,等.改进的火电调峰方式[J].电力系统自动化,2006,30(1):89-93.Liao Shengli,Cheng Chuntian,Cai Huaxiang,et al.Improved algorithm of adjusting discharge peak by thermal power plants[J].Automation of Electric Power Systems,2006,30(1):89-93(in Chinese).
[10]
申建建,程春田,李卫东.多电网调峰的水火核电力系统网间出力分配方法[J].中国电机工程学报,2014,34(7):1041-1051.Shen Jianjian,Cheng Chuntian,Li Weidong.Solutions to power generation allocation among multiple power grids in peak operation of hydro,thermal and nuclear plants[J].Proceedings of the CSEE,2014,34(7):1041-1051(in Chinese).
[11]
袁旭峰,韩士博,熊炜,等.计及梯级水电站群的水火电节能调度策略[J].电网技术,2014,38(3):616-621.Yuan Xufeng,Han Shibo,Xiong Wei,et al.Energy-saving generation scheduling strategy of hydropower and thermal power plants considering cascaded hydropower stations[J].Power System Technology,2014,38(3):616-621(in Chinese).
[12]
吴杰康,唐利涛,黄奂,等.基于遗传算法和数据包络分析法的水火电力系统发电多目标经济调度[J].电网技术,2011,35(5):76-81.Wu Jiekang,Tang Litao,Huang Huan,et al.Multi-objective economic scheduling for hydrothermal power systems based on genetic algorithm and data envelopment analysis[J].Power System Technology,2011,35(5):76-81(in Chinese).
[13]
程雄,申建建,程春田,等.大电网平台下抽水蓄能电站群短期多电网启发式调峰方法[J].电力系统自动化,2014,38(9):53-60.Cheng Xiong,Shen Jianjian,Cheng Chuntian,et al.A short-term heuristic method for peak operation of pumped hydroenergy storage plants between multiple power grids on bulk power grid platform[J].Automation of Electric Power Systems,2014,38(9):53-60(in Chinese).
[14]
王嘉阳,申建建,程春田,等.基于负荷重构策略的火电切负荷调峰方法[J].中国电机工程学报,2014,34(16):2684-2691.Wang Jiayang,Shen Jianjian,Cheng Chuntian,et al.A load shedding method for thermal power plants with peak regulation based on load reconstruction strategy[J].Proceedings of the CSEE,2014,34(16):2684-2691(in Chinese).
[15]
李茜,刘天琪,李兴源.大规模风电接入的电力系统优化调度新方法[J].电网技术,2013,37(3):733-739.Li Qian,Liu Tianqi,Li Xingyuan.A new optimized dispatch method for power grid connected with large-scale wind farms[J].Power System Technology,2013,37(3):733-739(in Chinese).
[16]
卢鹏,周建中,莫莉,等.梯级水电站发电计划编制与厂内一体化调度模式[J].电网技术,2014,38(7):1914-1922.Lu Peng,Zhou Jianzhong,Mo Li,et al.An integrated dispatching mode for daily generation scheduling and inner-plant economic operation of cascade hydropower plants[J].Power System Technology,2014,38(7):1914-1922(in Chinese).
[17]
Zhang R,Zhou J,Ouyang S,et al.Optimal operation of multi-reservoir system by multi-elite guide particle swarm optimization[J].International Journal of Electrical Power & Energy Systems,2013,48:58-68.
[18]
Hota P K,Barisal A K,Chakrabarti R.An improved PSO technique for short-term optimal hydrothermal scheduling[J].Electric Power Systems Research,2009,79(7):1047-1053.