姚建国,杨胜春.智能电网“源-网-荷”互动运行控制概念及研究框架[J].电力系统自动化,2012,36(21):1-6.Yao Jianguo,Yang Shengchun.Concept and research framework of smart grid “source-grid-load” interactive operation and control[J].Automation of Electric Power Systems,2012,36(21):1-6(in Chinese).
[2]
刘晓.新能源电力系统广域源荷互动调度模式理论研究[D].北京:华北电力大学,2012.
[3]
夏叶,康重庆.用户侧互动模式下发用电一体化调度计划[J].电力系统自动化,2012,36(2):1-6.Xia Ye,Kang Chongqing.A generation and load integrated scheduling on interaction mode on customer side[J].Automation of Electric Power Systems,2012,36(2):1-6(in Chinese).
[4]
夏叶,康重庆.用户侧互动模式下发用电一体化静态安全校核[J].电力系统自动化,2012,36(9):1-6.Xia Ye,Kang Chongqing.Generation and load integrated static security checking on interaction mode on customer side[J].Automation of Electric Power Systems,2012,36(9):1-6(in Chinese).
[5]
邱威,张建华.计及运行风险的多目标发电优化调度[J].中国电机工程学报,2012,32(22):1-8.Qiu Wei,Zhang Jianhua.Multi-objective optimal generation dispatch with consideration of operation risk[J].Proceedings of the CSEE,2012,32(22):1-8(in Chinese).
[6]
Ni M,McCalley J D,Vittal V,et al.Online risk-based security assessment[J].IEEE Transactions on Power Systems,2003,18(1):258-265.
[7]
李文沅.电力系统风险评估:模型、方法和应用[M].北京:科学出版社,2006:225-227.
[8]
齐先军,丁明.发电系统中旋转备用方案的风险分析与效用决策[J].电力系统自动化,2008,32(3):9-13.Qi Xianjun,Ding Ming.Risk Analysis and utility decision-making of spinning reserve scheme in power generation system[J].Automation of Electric Power Systems,2008,32(3):9-13(in Chinese).
[9]
张国华,段满银,张建华,等.基于证据理论和效用理论的电力系统风险评估[J].电力系统自动化,2009,33(23):1-4.Zhang Guohua,Duan Manyin,Zhang Jianhua,et al.Power system risk assessment based on the evidence theory and utility theory[J].Automation of Electric Power Systems,2009,33(23):1-4(in Chinese).
[10]
张忠新.电锅炉水储热技术是转移高峰负荷的一种有效手段[J].电网技术,1999,23(1):43-44.Zhang Zhongxin.Accumulation heat by water in electric heating boiler to regulate load[J].Power System Technology,1999,23(1):43-44(in Chinese).
[11]
王蓓蓓,李扬.冰蓄冷空调技术对南京地区电网调峰的影响[J].能源技术,2002,23(6):271-273.Wang Beibei,Li Yang.Effects of ice cold storage air-conditioner technology on peak-load regulation in Nanjing power grid[J].Energy Technology,2002,23(6):271-273(in Chinese).
[12]
纪洪,李冬梅,王浩锐,等.北京地区夏季电力市场调查报告[J].电力需求侧管理,2002,4(3):18-22.Ji Hong,Li Dongmei,Wang Haorui,et al.The research report of summer electric market in Beijing[J].Electric Demand Management,2002,4(3):18-22(in Chinese).
[13]
弋长青,杨华,李顺福,等.西北电网高耗能企业用电市场调研报告[J].电力需求侧管理,2002,4(4):26-28.Yi Changqing,Yang Hua,Li Shunfu,et al.A power consuming market research report of high-energy enterprise in northwest grid[J].Power Demand Side Management,2002,4(4):26-28(in Chinese).
[14]
王蓓蓓,刘小聪,李扬.面向大容量风电接入考虑用户侧互动的系统日前调度和运行模拟研究[J].中国电机工程学报,2013,33(22):36-40.Wang Beibei,Liu Xiaocong,Li Yang.Day-ahead generation scheduling and operation simulation considering demand response in large-capacity wind power integrated systems[J].Proceedings of the CSEE,2013,33(22):36-40(in Chinese).
[15]
祝贺,徐建源.风电场GM-WEIBULL风速分布组合模型出力预测[J].华东电力,2008,36(11):144-146.Zhu He,Xu Jianyuan.The wind farm output prediction on GM-WIIBULL wind speed[J].East China Electric Power,2008,36(11):144-146(in Chinese).
[16]
The Reliability Test System Task Force of the Application of Probability Methods Subcommittee.IEEE reliability test system[J].IEEE Transactions on Power Apparatus and Systems,1979,98(6):2047-2054.
[17]
熊猛,高峰,张海峰,等.基于混合储能系统的风电场调度策略[J].电网技术,2014,38(5):1243-1249.Xiong Meng,Gao Feng,Zhang Haifeng,et al.Hybrid energy storage based generation scheduling of wind farms[J].Power System Technology,2014,38(5):1243-1249(in Chinese).
[18]
佘慎思,李征,蔡旭.基于风电场动态时空关系的风速分布模型研究[J].电网技术,2014,38(6):1432-1438.She Shensi,Li Zheng,Cai Xu.Research on wind speed distribution model of wind farm based on its dynamic space-time relation[J].Power System Technology,2014,38(6):1432-1438(in Chinese).
[19]
朱永胜,王杰,瞿博阳,等.含风电场的多目标动态环境经济调度[J].电网技术,2015,39(5):1315-1322.Zhu,Yongsheng,Wang Jie,Qu Boyang,et al.Multi-objective dynamic economic emission dispatching of power grid containing wind farms[J].Power System Technology,2015,39(5):1315-1322(in Chinese).