电网技术  2015 

考虑发电机励磁保护和OLTC的多时间尺度连锁故障模型

DOI: 10.13335/j.1000-3673.pst.2015.04.030, PP. 1075-1081

Keywords: 连锁故障,多时间尺度,OLTC,发电机励磁保护

Full-Text   Cite this paper   Add to My Lib

Abstract:

世界范围内多次连锁故障和大停电事故表明,无功电压相关因素对连锁故障具有重要影响。提出了一种计及有载调压变压器(on-loadtapchanger,OLTC)和发电机励磁保护的多时间尺度大停电模型。该模型提出了对无功电压具有重要影响的发电机励磁保护和OLTC动作的建模方法,并进一步基于该模型提出了多时间尺度连锁故障模拟方法,实现了连锁故障动态过程的清晰描述,克服了传统连锁故障模型在此方面的局限性。文中用IEEE30节点系统进行了连锁故障仿真计算,分析了发电机励磁保护、OLTC动作等与无功电压密切相关的因素对连锁故障的影响及机理,并揭示了连锁故障的若干阶段性特征。

References

[1]  Vaiman M,Bell K,Chen Y,et al.Risk assessment of cascading outages:methodologies and challenges[J].IEEE Transactions on Power Systems,2012,27(2):631-641.
[2]  王梅义.大电网事故分析与技术应用[M].北京:中国电力出版社,2008:232.
[3]  Atputharajah A,Saha T K.Power system blackouts-literature review[C]//Industrial and Information Systems (ICIIS),2009 International Conference on,Sri Lanka,2009:460-465.
[4]  石立宝,史中英,姚良忠,等.现代电力系统连锁性大停电事故机理研究综述[J].电网技术,2010,34(3):48-54. Shi Libao,Shi Zhongying,Yao Liangzhong,et al.A review of mechanism of large cascading failure blackouts of modern power system[J].Power System Technology,2010,34(3):48-54(in Chinese).
[5]  李继红,戴彦,王超,等.大电网连锁故障的风险分析及对策[J].电网技术,2011,35(12):43-49. Li Jihong,Dai Yan,Wang Chao,et al.Risk analysis and countermeasures to prevent cascading failures in large-scale power grids[J].Power System Technology,2011,35(12):43-49 (in Chinese).
[6]  梅生伟,薛安成,张雪敏.电力系统自组织临界特性与大电网安全[M].北京:清华大学出版社,2009:19-133.
[7]  易俊,周孝信,肖逾男.电力系统自组织临界特性分析与仿真模型[J].电网技术,2008,32(3):7-12. Yi Jun,Zhou Xiaoxin,Xiao Yunan.Analysis on power system self-organized criticality and its simulation model[J].Power System Technology,2008,32(3):7-12(in Chinese).
[8]  曹一家,陈彦如,曹丽华,等.复杂系统理论在电力系统中的应用研究展望[J].中国电机工程学报,2012,22(19):1-9. Cao Yijia,Chen Yanru,Cao Lihua,et al.Prospects of studies on application of complex system theory in power systems[J].Proceedings of the CSEE,2012,22(19):1-9(in Chinese).
[9]  Mei S,Xue A,Zhang X.Power grid complexity[M].Springer,2010:232-361.
[10]  Mei S,Xue A,Zhang X.On power system blackout modelling and analysis based on self-organized criticality[J].Science in China Series E:Technological Sciences,2008(51):209-219.
[11]  Dobson I,Carreras B A,Newman D E.A branching process approximation to cascading load-dependent system failure[C]//System Sciences,2004 Proceedings of the 37th Annual International Conference on.Hawaii:IEEE,2004:1-10.
[12]  Dobson I,Carreras B A,Lynch V E,et al.An initial model for complex dynamics in electric power system blackouts[C]//Hawaii International Conference on System Sciences.Hawaii:IEEE,2001:1-9.
[13]  Shengwei M,Fei H,Xuemin Z,et al.An improved OPA model and blackout risk assessment[J].IEEE Transactions on Power Systems,2009,24(2):814-823.
[14]  龚媛,梅生伟,张雪敏,等.考虑电力系统规划的OPA模型及自组织临界特性分析[J].电网技术,2014,38(8):2021-2028. Gong Yuan,Mei Shengwei,Zhang Xuemin,et al.An improved OPA model considering planning and self-organized criticality analysis[J].Power System Technology,2014,38(8):2021-2028 (in Chinese).
[15]  Rios M A,Kirschen D S,Jayaweera D,et al.Value of security:modeling time-dependent phenomena and weather conditions[J].IEEE Transactions on Power Systems,2002,17(3):543-548.
[16]  赵炜炜,张建华,易俊,等.改进的Manchester连锁故障模型及其应用[J].电网技术,2009,33(11):18-22. Zhao Weiwei,Zhang Jianhua,Yi Jun,et al.Research on improved manchester cascading failure model and its application[J].Power System Technology,2009,33(11):18-22 (in Chinese) .
[17]  王刚,梅生伟,胡伟.计及无功/电压特性的停电模型及自组织临界性分析[J].电力系统自动化,2007,31(1):9-13. Wang Gang,Mei Shengwei,Hu Wei.Blackout model with reactive power and voltage and its self-organized criticality[J].Automation of Electric Power Systems,2007,31(1):9-13 (in Chinese).
[18]  梅生伟,翁晓峰,薛安成,等.基于最优潮流的停电模型及自组织临界性分析[J].电力系统自动化,2006,30(13):1-5. Mei Shengwei,Weng Xiaofeng,Xue Ancheng,et al.Blackout model based on OPF and its self-organized criticality[J].Automation of Electric Power Systems,2006,30(13):1-5(in Chinese).
[19]  Shengwei M,Yixin N,Gang W,et al.A study of self-organized criticality of power system under cascading failures based on AC-OPF with voltage stability margin[J].IEEE Transactions on Power Systems,2008,23(4):1719-1726.
[20]  Mei S,Wu S,Zhang X,et al.Power system blackout model with transient constraints and its criticality[J].European Transactions on Electrical Power,2011,21(1):59-69.
[21]  Chiang H D,Dobson I,Thomas R J,et al.On voltage collapse in electric power systems[J].IEEE Transactions on Power Systems,1990,5(2):601-611.
[22]  陈为化,江全元,曹一家,等.电力系统电压崩溃的风险评估[J].电网技术,2005,29(19):36-41. Chen Weihua,Jiang Quanyuan,Cao Yijia,et al.Risk assessment of voltage collapse in power system[J].Power System Technology,2005,29(19):36-41(in Chinese).
[23]  倪以信,陈寿孙,张宝霖.动态电力系统的理论和分析[M].北京:清华大学出版社,2002:90-235.
[24]  孙元章,王志芳.OLTC仿真模型及其对电压无功稳定性的影响.电力系统自动化,1998,22(5):10-13. Sun Yuanzhang,Wang Zhifang.Modeling of OLTC and its impact on the voltage stability[J].Automation of Electric Power Systems,1998,22(5):10-13(in Chinese).
[25]  Zhu T X,Tso S K,Lo K L.An investigation into the OLTC effects on voltage collapse[J].IEEE Transactions on Power Systems,2000,15(2):515-521.
[26]  Elkraft System.Power failure in Eastern Denmark and Southern Sweden on 23 September 2003:Final report on the course of events[R].2003.
[27]  Girgis G K,Vu H D.Verification of limiter performance in modern excitation control systems[J].IEEE Transactions on Energy Conversion,1995,10(3):538-542.
[28]  US-Canada Power System Outage Task Force.Final Report on the August 14,2003 Blackout in the United States and Canada[R].2004.
[29]  印永华,郭剑波,赵建军,等.美加“8.14”大停电事故初步分析以及应吸取的教训[J].电网技术,2003,27(10):8-11. Yin Yonghua,Guo Jianbo,Zhao Jianjun,et al.Preliminary analysis of large scale blackout in interconnected North America power grid on August 14 and lessons to be drawn[J].Power System Technology,2003,27(10):8-11(in Chinese).
[30]  张保会,尹项根,索南加乐.电力系统继电保护[M].北京:中国电力出版社,2010:183-289.
[31]  Hill D J.Nonlinear dynamic load models with recovery for voltage stability studies[J].IEEE Transactions on Power Systems,1993,8(1):166-176.
[32]  Simpson P,Van Bossuyt R,Tree-caused electric outages[J].J.Arboricult,1996,22(5):117-121..
[33]  Varaiya P P,Wu F F,Bialek J W.Smart operation of smart grid:risk-limiting dispatch[J].Proceedings of the IEEE,2011,99(1):40-57.
[34]  Milano F.An open source power system analysis toolbox[J].IEEE Transactions on Power Systems,2005,20(3):1199-1206.
[35]  Junjian Q,Shengwei M,Feng L.Blackout model considering slow process[J].IEEE Transactions on Power Systems,2013,28(3):3274-3282.
[36]  孙元章,程林,何剑.电力系统运行可靠性理论[M].北京:清华大学出版社,2012:51-77.
[37]  吴文可,文福拴,薛禹胜,等.基于马尔可夫链的电力系统连锁故障预测[J].电力系统自动化,2013,37(5):29-37. Wu Wenke,Wen Fushuan,Xue Yusheng,et al.A Markov Chain based model for forecasting power system cascading failures[J].Automation of Electric Power Systems,2013,37(5):29-37(in Chinese).

Full-Text

comments powered by Disqus

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133