全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...
-  2018 

Using Rework Station for Minimizing Cycle Time in Assembly Line Balancing: Effects of Rework Rate and Station Position

Keywords: Montaj Hatt? Dengeleme,Yeniden ??leme ?stasyonu,Tamsay?l? Programlama,?evrim Süresi Minimizasyonu

Full-Text   Cite this paper   Add to My Lib

Abstract:

In assembly lines, rework stations are generally used only for reprocessing of defective products. However, the use of the rework station only for this purpose reduces the utilizations of the resources available in the station, especially if the defect rate of the assembly line is low. In this study, a mixed-integer programming model is developed to minimize the cycle time considering the usage of the rework station as a standard workstation. Using the developed model, we take into account locating the rework station in different positions, not just at the end of the assembly line as well as different defect rates in the assembly line. The performance of the model is tested on various samples in the literature

Full-Text

comments powered by Disqus

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133

WeChat 1538708413