Performance Improvement of Truck Assembly Line through Modeling and Simulation Using Arena Software

DOI: 10.4236/ojop.2021.103007, PP. 88-100

Keywords: Simulation, Arena, Productivity, Automotive Industry

Full-Text   Cite this paper   Add to My Lib

Abstract:

Due to global completion in the automotive industry, productivity improvement is vital in these industries. In automotive assembly lines, productivity loses are attributed to bottlenecks, long processing time in workstations and underutilization of resources. The purpose of this research is to evaluate the performance of the production system, analyze the bottlenecks in different parts of the workstation, their capacity and constraints. Also, develop different scenarios for improvement. To achieve this objective, a simulation model was developed using Arena Software to analyze bottlenecks in each workstation. The analysis was based on the queue in the system to identify the longest queue in workstations. After analysis of the assembly line, the result showed that the longest waiting time observed is cab preparation and drop, bumper, engine subassembly fitment of soundproof with respective numbers 14.4, 13.97, 13.00, 13.70 minutes, with respective average number waiting of 24.87%, 17.57%, 25.91% and 23.39%. Using different scenarios for the improvement of the production line showed that the waiting time observed in-cab preparation and drop, bumper, engine subassembly, fitment of soundproof has greatly reduced for the two workstations added and three operators respectively from 14.4 to 3.97 and 3.1, from 13.97 to 3.77 and 2.48, from 13.00 to 4.21 and 3.83, from 13.70 to 0.00 and 2.37 minutes, with respective average number waiting from 24.87% to 5% and 2%, from 17.57% to 5% and 0.9%, from 25.91% to 5% and 4%, and from 23.39% to 0.00% and 3%. To conclude the research study was able to demonstrate the modelling approach using simulation for analysis of a production line assembly. The contribution of this research was so enormous, this study has improved the output production up to 144%.

References

[1]  Araya Teklay, T., Presented, I.E., Fulfilment, P., Engineering, M. and Stream, I.E. (2018) Efficiency Analysis and Performance Improvement of Bottling Production Line. A Thesis Submitted to the School of Mechanical and Industrial Engineering. Partial Fulfillment of the Requirements for the Degree of Master of Science in Mechanical Eng.
[2]  Ndungu, J.N., Muchiri, P.N. and Muguthu, J. (1998) Productivity Improvement of the Manufacturing Processes through Modelling and Simulation Analysis. A Case Study of a Vehicle Assembly Plant in Kenya, 1-7.
[3]  Lanna, F. (2013) A Study on Production Productivity Improvement in Food Processing Industries. Jurnal Teknologi, 1, 69-73.
https://doi.org/10.11113/jt.v56.60
[4]  Svensson, B.O. (2010) Optimisation of Manufacturing Systems Using Time Synchronised Simulation.
[5]  Spieckermann, S., Gutenschwager, K., Heinzel, H. and Voß, S. (2014) Simulation-Based Optimization in the Automotive Industry—A Case Study on Body Shop Design.
[6]  Tahar, R.B.M. and Adham, A.A.J. (2010) Design and Analysis of Automobiles Manufacturing System Based on Simulation Model. Modern Applied Science, 4, 130.
https://doi.org/10.5539/mas.v4n7p130
[7]  Jayaraman, A. and Gunal, A.K. Applications of Discrete Event Simulation in the Design of Automotive Powertrain Manufacturing Systems. Winter Simulation Conference, 758-764.
https://doi.org/10.1145/268437.268620
[8]  Marsudi, M. and Shafeek, H. (2013) The Evaluation of Production Line Performance by Using ARENA—A Case Study. Int. J. Ind. Sci. Eng., 7, 655-659.
https://doi.org/10.3182/20130619-3-RU-3018.00515
[9]  Büyüksaatçi Kiriş, S. and Ünal, M. (2020) Evaluating the Performance of the Production Line with Simulation Approach in Meat Processing Industry: A Case from Turkey. Alphanumeric Journal, 8, 1-16.
https://doi.org/10.17093/alphanumeric.717667
[10]  Dewa, M. and Chidzuu, L. (2013) Managing Bottlenecks. Manual Automotive Assembly Systems Using Discrete Event Simulation, 12, 155-166.
https://doi.org/10.7166/24-2-567
[11]  Ndungu, J.N., et al. (2016) Productivity Improvement of the Manufacturing Processes through Modelling and Simulation Analysis. A Case Study of a Vehicle Assembly Plant in Kenya.
[12]  Rawangwong, S., Homkhiew, C., Sani, S., Rodjananugoon, J. and Tehyo, M. (2020) Efficiency Improvement in Assembly Rubber Wooden Toys Using Motion and Times Study and Principles of Ergonomics: A Case Study of a Sample Factory. Princess of Naradhiwas University Journal, 12, 97-112.