从“福岛改进项”运作反馈探讨核电厂应急设备管理
Discussion of Emergency Equipment Management on Nuclear Power Plant from the “Operation Feedback of the Post-Fukushima Improvement Action”

DOI: 10.12677/NST.2023.111008, PP. 70-74

Keywords: 福岛改进项,应急设备管理
Post-Fukushima Improvement Action
, Emergency Equipment Management

Full-Text   Cite this paper   Add to My Lib

Abstract:

日本福岛核事故后,人们认识到对于小概率的、后果严重的超设计基准事故,需考虑设置缓解和处理设施,各核电厂根据堆型和厂址特点均增加了大型移动应急设备,但实际运作却存在诸多问题。随着全球气候变暖,中国“双碳”目标下,核电将迎来全新的发展机会。本文通过国内某核电集团在运核电基地福岛改进项运作反馈中,提出建设地方应急设备中心的观点以及四点建设原则,通过组建专业的应急队伍、集约管理大型移动应急设备来保障区域内相关营运单位的安全,供应急从业人员和设计人员参考。
After the Fukushima nuclear accident in Japan, it was realized that for the small probability and serious consequences of exceeding-design benchmark accidents, it is necessary to consider setting up mitigation and treatment facilities. According to the type of reactor and the site of factory, all nuclear power plants have added large mobile emergency equipment, but there are many problems in actual operation. With global warming, China’s “double carbon” goal will usher in new development opportunities for nuclear power. In this paper, through a domestic nuclear power group in the operation feedback of the Post-Fukushima improvement action, we put forward the point of building the center of the local emergency equipment center and four construction principles through the establishment of professional emergency team, and intensive management of large mobile emergency equipment to ensure the safety of relevant operating units in the region. These ideas are available to emergency practitioners and designers.

References

[1]  国际原子能机构网站. 日决定向海洋排放福岛污水[EB/OL]. https://www.iaea.org/, 2021.
[2]  光明网. 为什么清理福岛损毁的核电站还需要30年[EB/OL]. https://m.gmw.cn/, 2021.
[3]  国家核安全局. 福岛事故后核电厂改进行动通用技术要求[Z]. 国核安发[2012]98号, 2012.
[4]  郝立民, 石雪峰, 修璐倩. 福岛改进项之电源改进的合理性分析及建议[J]. 军民两用技术与产品, 2018(6): 1.
[5]  伍浩松, 戴定. WANO宣布完成12个后福岛安全改进项目[J]. 国外核新闻, 2018(7): 1.
[6]  刘稳产, 左丽红. 在建CPR1000项目福岛核事故后安全改进项的组织与实施[J]. 项目管理技术, 2014(10): 7.
[7]  李小拼. 李云屹. 后“福岛”时代我国核电项目前期策略的改进研究[J]. 南华大学学报(社会科学版), 2018, 19(3): 17-22.