梯级水库防洪调度与溃坝洪水的耦合研究
Coupling Study of Flood Control Operation and Dam-Break Flood of Cascade Reservoirs

, PP. 1-11

Keywords: 梯级水库群,防洪调度,溃坝洪水计算
Cascade Reservoirs
, Flood Control Operation, Dam-Break Flow Calculation

Full-Text   Cite this paper   Add to My Lib

Abstract:

针对现有研究未考虑水库群超标洪水应急处置与溃坝洪水模拟的关联性问题,本文提出了水库群防洪应急调度–溃坝洪水计算耦合模型。该模型以水库群防洪应急调度模型为基础,一旦发生溃坝,快速调用基于实际来水过程与大坝特征参数的溃口洪水与洪水河道演进计算模块,解决了当流域发生溃坝事故调度过程难以接续的问题,实现了对流域水库群在遭遇溃坝洪水情况下的全过程、精确化调度模拟。并以泉河流域五座梯级水库为例,输入不同量级的两次洪水过程,采用本文所建立的耦合模型进行水库群应急调度计算。结果表明,所建立的模型能够有效地实现对洪水的削峰错峰,降低流域梯级水库的防洪风险。研究结果可为各流域水库群溃坝洪水的应急处置方案的快速制定提供科学依据。
The existing research has not considered the correlation between reservoirs emergency disposal of exceeding standard flood and dam-break flow simulation. Therefore, the coupling model of flood control emergency operation with dam-break flow calculation for reservoir group is proposed. The established model is based on the reservoir flood control emergency operation model. In case of dam break, it can quickly call the calculation model of breach flow and flood evolution process based on actual inflow process and dam characteristic parameters. The coupling model solves the problem that the operation process is difficult to continue when dam break occurs in the basin, and realizes the whole-processed and accurate operation simulation when the reservoir group encounters exceeding standard flood. The established coupling model was applied at five cascade reservoirs in the Quanhe River basin, and two flood processes with different frequencies were used as the inputs. The results indicated that the established model can effectively reduce the flood peak and the flood risk. The research results can provide scientific basis for the rapid formulation of emergency response plan for dam-break flood as well.

References

[1]  CHEN, L., et al. Water-sediment-energy joint operation model of large-scale reservoir group for sediment-laden rivers. Journal of Cleaner Production, 2022, 370: 133271.
https://doi.org/10.1016/j.jclepro.2022.133271
[2]  中华人民共和国水利部. 2020年全国水利发展统计公报[M]. 北京: 中国水利水电出版社, 2021. Ministry of Water Resources of the People’s Republic of China. 2020 Statistic bulletin on China water activities. Beijing: China Water & Power Press, 2021. (in Chinese)
[3]  盛金保, 李宏恩, 盛韬桢. 我国水库溃坝及其生命损失统计分析[J]. 水利水运工程学报, 2023(1): 15. SHENG Jinbao, LI Hongen and SHENG Taozhen. Statistical analysis of dam failure and its loss of life in China. Hy-dro-Science and Engineering, 2023(1): 15. (in Chinese)
[4]  王立辉, 胡四一. 溃坝问题研究综述[J]. 水利水电科技进展, 2007(1): 80-85. WANG Lihui, HU Siyi. Study on dam failure-related problems. Advances in Science and Technology of Water Resource, 2007(1): 80-85. (in Chinese)
[5]  孟相君, 林芝, 薛洋, 童景辉. 水电站大坝溃坝洪水计算现状分析[J]. 大坝与安全, 2022(4): 6-10. MENG Xiangjun, LIN Zhi, XUE Yang and TONG Jinghui. Analysis on the current status of dam-breach flow calculation of hydropower stations. Dam & Safety, 2022(4): 6-10. (in Chinese)
[6]  MARANGOZ, H. O., ANILAN, T. Two-dimensional modeling of flood wave propagation in residential areas after a dam break with application of diffusive and dynamic wave approaches. Natural Hazards, 2022, 110: 429-449.
https://doi.org/10.1007/s11069-021-04953-w
[7]  黄志中, 周之豪. 防洪系统实时优化调度的多目标决策模型[J]. 河海大学学报(自然科学版), 1994, 22(6): 16-21. HUANG Zhizhong, ZHOU Zhihao. A multi-objective decision making model for real-time optimization of flood control systems. Journal of Hohai University, 1994, 22(6): 16-21. (in Chinese)
[8]  AKBARI, M., AFSHAR, A. and MOUSAVI, S. J. Multi-objective reservoir operation under emergency condition: Abbaspour reservoir case study with non-functional spillways. Journal of Flood Risk Management, 2015, 7(4): 374-384.
https://doi.org/10.1111/jfr3.12061
[9]  贾本有, 钟平安, 陈娟, 吴业楠. 复杂防洪系统联合优化调度模型[J]. 水科学进展, 2015, 26(4): 560-571.
https://doi.org/10.14042/j.cnki.32.1309.2015.04.013 JIA Benyou, ZHONG Pingan, CHEN Juan and WU Yenan. Coordinated optimal operation model of complex flood control system. Advances in Water Science, 2015, 26(4): 560-571. (in Chinese)
[10]  陈森林, 孙亚婷, 黄宇昊. 水库防洪等蓄量优化调度模型及应用[J]. 水科学进展, 2018, 29(3): 374-382.
https://doi.org/10.14042/j.cnki.32.1309.2018.03.009 CHEN Senlin, SUN Yating and HUANG Yuhao. Development and application of an equal volume of storage optimization model for reservoir flood-control. Advances in Water Science, 2018, 29(3): 374-382. (in Chinese)
[11]  李炜. 水力计算手册[M]. 第2版. 北京: 中国水利水电出版社, 2006. LI Wei. Hydraulic calculation manual. 2nd Edition. Beijing: China Water & Power Press, 2006. (in Chinese)

Full-Text

comments powered by Disqus

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133

WeChat 1538708413