CPR1000机组大修B10调整优化方案研究
Study on B10 Adjustment and Optimization Scheme of CPR1000 Unit Overhaul

DOI: 10.12677/nst.2024.123017, PP. 162-170

Keywords: B10丰度调整,制硼装置,大修,硼回收系统
B10 Abundance Adjustment
, Boron Production Device, Overhaul, Boron Recovery System

Full-Text   Cite this paper   Add to My Lib

Abstract:

该总结描述了一种用于CPR1000机组一回路提高B10丰度的系统及方法,系统包括:一回路系统、与一回路系统连接的硼溶液贮存箱,以及用于制备富集硼酸的临时装置;与临时装置连接的硼回收系统中间箱。该优化方案方法,通过临时装置将富集硼注入中间箱内,并利用中间箱、硼溶液贮存箱和换料水箱之间的硼水传输过程,将富集硼带入至相关系统,从而将一回路B10丰度提高至正常水平。
This paper presents a system and method designed to enhance the abundance of B10in the primary circuit of CPR1000 unit. The system comprises a primary circuit system, a boron solution storage tank connected to the primary circuit system, and a temporary device for preparing and enriching boric acid. An intermediate box of boron recovery system is connected to the temporary unit. In this optimization scheme, enriched boron is injected into the intermediate tank through a temporary device, and the transfer process of boron water between the intermediate tank, the boron solution storage tank, and the refueling tank are utilized to introduce enriched boron into the relevant system, thereby increasing the primary B10 abundance to normal levels.

References

[1]  张卫江. 富集硼10同位素的应用[C]//第四届中国核学会省市区“三核”论坛论文汇编. 天津: 天津大学化学工程研究所, 2007: 4.
[2]  谭世杰, 廉志坤, 李志军, 周骁凌, 胡汝平, 高景辉. CPR1000核电机组一回路临界硼浓度偏差机理研究[J]. 核动力工程, 2019, 33(1), 112-116.
[3]  广东核电培训中心. 大亚湾核电站系统及运行: 上册[M]. 北京: 原子能出版社, 1995.
[4]  王绪懿, 程嘉林, 刘通. 秦山第二核电厂硼和水补给系统制硼方案的研究与改进[J]. 产业与科技论坛, 2019, 18(16): 47-48.
[5]  蔡光明. 反应堆一回路可溶硼10B丰度的跟踪计算[J]. 核科学与工程, 2007, 27(3): 240-245.