全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

Improving Accuracy in Earthwork Volume Estimation for Proposed Forest Roads Using a High-Resolution Digital Elevation Model

Keywords: forest roads , earthwork volume , road design , LiDAR , digital elevation model

Full-Text   Cite this paper   Add to My Lib

Abstract:

Earthwork usually represents the largest cost component in the construction of low-volume forest roads. Accurate estimates of earthwork volume are essential to forecast construction costs and improve the financial control of road construction operations. Traditionally, earthwork volumes are estimated using methods that consider ground data obtained from survey stations along road grade lines. However, these methods may not provide accurate estimates when terrain variations between survey stations are ignored. In this study, we developed a computerized model to accurately estimate earthwork volumes for the proposed forest roads by using a high-resolution digital elevation model (DEM). We applied our model to three hypothetical forest road layouts with different ground slopes and terrain ruggedness conditions. We examined the effects of various cross-section spacings on the accuracy of earthwork volume estimation assuming that 1-meter spacing provides the true earthwork volume. We also compared our model results with those obtained from the traditional end-area method. The results indicate that as cross-section spacing increases the accuracy of earthwork volume estimation decreases due to lack of the ability to capture terrain variations. We quantified earthwork differences, which increased with terrain ruggedness ranging from 2 to 21%. As expected, short cross-section spacing should be applied to improve accuracy in earthwork volume estimation when roads are planned and located on hilly and rugged terrain.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133