全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

Quantitative Analysis of the Sources of Construction Waste

DOI: 10.1155/2014/651060

Full-Text   Cite this paper   Add to My Lib

Abstract:

The construction industry is traditionally environmentally unfriendly. The environmental impacts of construction waste include soil contamination, water contamination, and deterioration of landscape. Also, construction waste has a negative economic impact by contributing additional cost to construction due to the need to replace wasted materials. However, in order to mitigate waste, construction managers have to explore management options, which include reduction, recycling, and disposal of wastes. Reduction has the highest priority among the waste management options but efficient reduction cannot be achieved without adequate identification of the sources of waste. Therefore, the purpose of this paper is to present a study that was carried out on the contribution rates of nine identified sources of construction waste. Establishing the contribution rates of different waste sources will enhance knowledge-based decision-making in developing appropriate strategy for mitigating construction waste. Quantitative research method, using survey questionnaire, was adopted in this study to assess the frequency and severity of contribution of the sources of waste. As one of the findings of the study, residual waste such as material off-cuts was identified as the highest contributor to construction waste. This study consequently demonstrated that waste has a significant contribution to the cost of construction. 1. Introduction Waste may be generated during both the extraction and processing of the raw materials and eventual consumption of final products therein. Rubbles and other waste materials arise from construction activities like demolition, renovation of buildings, and new construction [1]. The construction industry is traditionally environmentally unfriendly [2, 3]. Construction cultural practice contributes to waste where trade contractors are rewarded for speed rather than their concern for the environmental impact of their work [4]. Furthermore, construction activities consume a large quantity of materials and energy as well as generating unacceptable level of solid waste [3]. The construction industry consumes 25% of virgin wood and 40% of raw stone, gravel, and sand globally every year [5]. In the US, the production of building components and construction process itself use 40% of extracted materials [6]. Construction work leads to land development, land deterioration, resources depletion, waste generation, and various forms of pollution [7, 8]. The construction industry generates about 35% of industrial waste in the world [9, 10]. In the European Union,

References

[1]  P. Nowak, M. Steiner, and U. Wiegel, “Waste management challenges for the construction industry,” Construction Information Quarterly, vol. 11, no. 1, p. 8, 2009.
[2]  A. T. W. Yu, C. S. Poon, A. Wong, R. Yip, and L. Jaillon, “Impact of construction waste disposal charging scheme on work practices at construction site in Hong Kong,” Waste Management, vol. 33, no. 1, pp. 138–146, 2013.
[3]  H. Yuan, A. R. Chini, Y. Lu, and L. Shen, “A dynamic model for assessing the effects of management strategies on the reduction of construction and demolition waste,” Waste Management, vol. 32, no. 3, pp. 521–531, 2012.
[4]  G. Sullivan, S. Barthorpe, and S. Robbins, Managing Construction Logistics, John Wiley & Sons, Blackwell, London, UK, 2010.
[5]  U. Kulatunga, D. Amaratunga, R. Haigh, and R. Rameezdeen, “Attitudes and perceptions of construction workforce on construction waste in Sri Lanka,” Management of Environmental Quality, vol. 17, no. 1, pp. 57–72, 2006.
[6]  C. Kibert and R. Ries, “Green building education and research at the University of Florida,” in Proceedings of the 45th ASC International Annual Conference, T. Sulbaran, Ed., Gainesville, Fla, USA, 2009.
[7]  G. Ofori, C. Briffett, G. Gang, and M. Ranasinghe, “Impact of ISO 14000 on construction enterprises in Singapore,” Construction Management and Economics, vol. 18, no. 8, pp. 935–947, 2000.
[8]  W. Y. M. Tam, C. M. Tam, W. W. J. Chan, and C. Y. W. Ng, “Cutting construction by prefabrication,” International Journal of Construction Management, vol. 6, no. 1, pp. 15–25, 2006.
[9]  C. F. Hendriks and H. S. Pietersen, Sustainable Raw Materials: Construction and Demolition Waste, RILEM Publication, Cachan Cedex, France, 2000.
[10]  J. Solis-Guzman, M. Marrero, M. V. Montes-Delgado, and A. Ramírez-de-Arellano, “A Spanish model for quantification and management of construction waste,” Waste Management, vol. 29, no. 9, pp. 2542–2548, 2009.
[11]  J. Egan, Rethinking Construction: The Report of the Construction Task Force to the Deputy Prime Minister, John Prescott, on the Scope for Improving the Quality and Efficiency of UK Construction, Department for Trade and Industry, London, UK, 1998.
[12]  C. Leiva, L. F. Vilches, J. Vale, and C. Fernández-Pereira, “Influence of the type of ash on the fire resistance characteristics of ash-enriched mortars,” Fuel, vol. 84, no. 11, pp. 1433–1439, 2005.
[13]  L. L. Ekanayake and G. Ofori, “Construction material waste source evaluation,” in Proceedings of the Strategies for a Sustainable Built Environment, Pretoria, South Africa, August 2000.
[14]  C.-L. Peng, D. E. Scorpio, and C. J. Kibert, “Strategies for successful construction and demolition waste recycling operations,” Construction Management and Economics, vol. 15, no. 1, pp. 49–58, 1997.
[15]  M. M. M. Teo and M. Loosemore, “A theory of waste behaviour in the construction industry,” Construction Management and Economics, vol. 19, no. 7, pp. 741–751, 2001.
[16]  C. T. Formoso, L. Soibelman, C. de Cesare, and E. L. Isatto, “Material waste in building industry: main causes and prevention,” Journal of Construction Engineering and Management, vol. 128, no. 4, pp. 316–325, 2002.
[17]  B. A. G. Bossink and H. J. H. Brouwers, “Construction waste: quantification and source evaluation,” Journal of Construction Engineering and Management, vol. 122, no. 1, pp. 55–60, 1996.
[18]  N. Kartam, N. Al-Mutairi, I. Al-Ghusain, and J. Al-Humoud, “Environmental management of construction and demolition waste in Kuwait,” Waste Management, vol. 24, no. 10, pp. 1049–1059, 2004.
[19]  C. S. Poon, A. T. W. Yu, and L. H. Ng, “On-site sorting of construction and demolition waste in Hong Kong,” Resources, Conservation and Recycling, vol. 32, no. 2, pp. 157–172, 2001.
[20]  M. Erlandsson and P. Levin, “Environmental assessment of rebuilding and possible performance improvements effect on a national scale,” Building and Environment, vol. 40, no. 11, pp. 1459–1471, 2005.
[21]  E. K. Lauritzen, “Emergency construction waste management,” Safety Science, vol. 30, no. 1-2, pp. 45–53, 1998.
[22]  G. Banias, C. Achillas, C. Vlachokostas, N. Moussiopoulos, and I. Papaioannou, “A web-based decision support system for the optimal management of construction and demolition waste,” Waste Management, vol. 31, no. 12, pp. 2497–2502, 2011.
[23]  DEFRA, Department for Environment, and Food and Rural Affairs; UK, “Construction and demolition waste management: 1999–2005,” 2013, http://webarchive.nationalarchives.gov.uk/20130123162956/http:/www.defra.gov.uk/evidence/statistics/environment/waste/kf/wrkf09.htm.
[24]  EPHC, Environmental Protection & Heritage Council National Waste Overview—Characterization of Building-Related Construction and Demolition Debris in the United States, US Environmental Protection Agency, 2013, http://www.epa.gov/wastes/hazard/generation/sqg/cd-rpt.pdf.
[25]  M. Osmani, J. Glass, and A. D. F. Price, “Architects' perspectives on construction waste reduction by design,” Waste Management, vol. 28, no. 7, pp. 1147–1158, 2008.
[26]  Y. Yang and L. Shi, “Integrating environmental impact minimization into conceptual chemical process design—a process systems engineering review,” Computers & Chemical Engineering, vol. 24, no. 2–7, pp. 1409–1419, 2000.
[27]  R. M. Gavilan and L. E. Bernold, “Source evaluation of solid waste in building construction,” Journal of Construction Engineering and Management, vol. 120, no. 3, pp. 536–552, 1994.
[28]  R. Navon and O. Berkovich, “An automated model for materials management and control,” Construction Management and Economics, vol. 24, no. 6, pp. 635–646, 2006.
[29]  J. C. T. Kwan, Tools for Measuring and Forecasting Waste Generated on Site: Scoping Study, Construction Industry Research and Information Association, London, UK, 2001.
[30]  J. W. Creswell, Research Design: Qualitative, Quantitative and Mixed Method Approaches, Sage, Thousand Oaks, Calif, USA, 2003.
[31]  M. Henn, M. Weinstein, and N. Foard, A Short Introduction of Social Research, Sage Publications, London, UK, 2006.
[32]  D. de Vaus, Surveys in Social Research, Routledge, London, UK, 5th edition, 2002.
[33]  B. Somekh and C. Lewin, Research Methods in the Social Sciences, Sage, London, UK, 2005.
[34]  J. S. Uebersax, “Likert scales: dispelling the confusion,” Statistical Methods for Rater Agreement, February 2013, http://www.john-uebersax.com/stat/likert.htm.
[35]  S. A. Assaf and S. Al-Hejji, “Causes of delay in large construction projects,” International Journal of Project Management, vol. 24, no. 4, pp. 349–357, 2006.
[36]  R. Carmichael, D. J. Edwards, and G. D. Holt, “Plant managers' perceptions of plant security systems,” Engineering, Construction and Architectural Management, vol. 14, no. 1, pp. 65–78, 2007.
[37]  P. Jennings and G. D. Holt, “Prequalification and multi-criteria selection: a measure of contractors' opinions,” Construction Management and Economics, vol. 16, no. 6, pp. 651–660, 1998.
[38]  O. O. Fadiya, P. Georgakis, E. Chinyio, and P. Akadiri, “Analysing the perceptions of UK building contractors on the contributors to the cost of construction plant theft,” Journal of Financial Management of Property and Construction, vol. 18, no. 2, 2013.
[39]  O. Fadiya, P. Georgakis, E. Chinyio, and C. Nwagboso, “Perceptions of building contractors concerning plant theft,” International Journal of Architecture, Engineering and Construction, vol. 1, no. 1, pp. 47–54, 2012.
[40]  J. Mirabella, “Hypothesis testing with SPSS: a non-statistician guide & tutorial,” 2006, http://www.drjimmirabella.com/ebook/excerpt%20from%20Hypothesis%20Testing%20with%20SPSS%20ebook%20(Jim%20Mirabella).pdf.
[41]  A. W. Kerr, H. K. Hall, and S. A. Kozub, Doing Statistics with SPSS, Sage Publications, London, UK, 2002.
[42]  J. DeCoster and H. Claypool, Data analysis in SPSS, 2004, http://www.stat-help.com/spss.pdf.
[43]  T. R. Black, Evaluating Social Science Research: An Introduction, Sage Publications, London, UK, 1994.
[44]  M. Tavakol and R. Dennick, “Making sense of Cronbach’s alpha,” International Journal of Medical Education, vol. 2, pp. 53–55, 2011.
[45]  J. A. Gliem and R. R. Gliem, “Calculating, interpreting and reporting Cronbach’s alpha reliability coefficient for Likert-type scales,” in Proceedings of the Midwest Research to Practice Conference in Adult, Continuing and Community Education, pp. 82–88, Ohio State University, Columbus, Ohio, USA, 2003.
[46]  J. M. Bland and D. G. Altman, “Statistics notes: cronbach’s alpha,” British Medical Journal, vol. 314, article 275, 1997.
[47]  R. DeVellis, Scale Development: Theory and Applications, Sage, Thousand Oaks, Calif, USA, 2003.
[48]  G. Hobbs, “Developing a strategic approach to construction waste,” 2011, http://www.bre.co.uk/filelibrary/pdf/rpts/waste/ConstructionWasteReport240906.pdf.
[49]  Building Research Establishment, “BRE waste benchmark data,” 2010, http://www.smartwaste.co.uk/filelibrary/benchmarks%20data/Waste_Benchmarks_for_new_build_projects_by_project_type_28_February_ 2011.pdf.
[50]  The Highland Council, “Charges for the collection and disposal of commercial waste and the hire of waste skips—2011/12,” 2010, http://www.highland.gov.uk/download/meetings/id/22562/item10tec9810pdf.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133