Cao Xueqin, Zhu Jinlong. Analysis of the distribution of longitudinal braking force on urban rail Trasit Bridge [J]. China Railway Science, 2004, 25(4): 73―79. (in Chinese)
Xu Qingyuan, Chen Xiufang. Additional longitudinal forces transmission between bridges and continuously welded rails with small resistance fasteners [J]. Journal of Traffic And Transportation Engineering, 2003, 3(1): 25―29. (in Chinese)
Yan Bin, Dai Gonglian, Dong Linyu. Design parameters of track-bridge interaction on passenger dedicated line cable-stayed bridge [J]. Journal of Traffic And Transportation Engineering, 2012, 12(1): 31―37. (in Chinese)
Cai Chengbiao. Calculation of additional longitudinal Forces in continuously welded rails on supper-large bridges of High-Speed Railways [J]. Journal of Southwest Jiaotong University, 2003, 38(5): 609―614. (in Chinese)
Ma Kunquan, Shen Qianbin, Jiang Peng. The Girder-Rail Interaction of Continuous Welded Rails on Viaduct [J]. Urban Mass Transit, 2008(8): 25―29. (in Chinese)
Dai Gonglian, Yan Bin. Interaction between cable-stayed bridge traveled by high-speed trains and continuously welded rail [J]. China Civil Engineering Journal, 2013, 46(8): 90―97. (in Chinese)
[13]
Ruge P, Birk C. Longitudinal forces in continuously welded rails on bridge decks due to nonlinear track-bridge interaction [J]. Computers And Structures, 2007, 85(7/8): 458―475.
[14]
Ruge P, Widarda D R, Schmalzlin G, Bagayoko L. Longitudinal track-bridge interaction due to sudden change of coupling interface [J]. Computers & Structures, 2009, 87(1/2): 47―58.
Zeng Zhen, Fu Tinglong, Ma Hongchao, Xiao Jieling. Analysis of loaded resistance for small resistance fasteners [J]. Subgrade Engineering, 2011(1): 19―24. (in Chinese)
Jiang Peng, Ma Kunquan. Research on longitudinal stiffness of the top of piers for urban rail transit bridge [J]. China Municipal Engineering, 2007(Suppl 2): 48―51. (In Chinese)
Ma Kunquan, Chen Yu, Pan Xiangwen. Reasonable infrastructure longitudinal stiffness of rail transit viaduct with U-shape Girder [J]. Urban Mass Transit, 2010, 13(1): 36―40. (in Chinese)
The fourth survey and design company of Ministry of Railways. Seamless railway line design standard (draft for examination) [DB/OL]. http://www. docin.com/ p-138737918.html, 2011-11-02. (in Chinese)
Wu Liangqin, Wu Dingjun, Li Qi. Experiment Study on Braking Force for Urban Rail Transit Bridge [J]. Journal of the china railway society, 2012, 34(3): 88―93. (in Chinese)
Zhou Canjun. The investigation and analysis of the use of different types of fasteners in the subway [C]// Collected Papers of the Forum of Key Technology in Urban Rail Transit. Beijing: Civil Engineering Society of China, 2010: 532―535.