全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

Evaluating the Effects of Digital Transformation on Facilities Management Projects in Saudi Arabia: Overcoming Challenges and Seizing Opportunities

DOI: 10.4236/ojce.2024.144030, PP. 536-569

Keywords: Digital Transformation, Facilities Management (FM), Saudi Arabia, Predictive Maintenance, Building Information Modeling (BIM), Internet of Things (IoT)

Full-Text   Cite this paper   Add to My Lib

Abstract:

This study evaluates the effects of digital transformation on facilities management (FM) projects in Saudi Arabia, focusing on the key technologies used, their benefits, challenges, and the opportunities they present. The research employs a mixed-methods approach, combining quantitative data from surveys with qualitative insights from expert interviews and case studies. The survey, involving 313 respondents from various FM sectors, highlights the widespread adoption of technologies like CMMS, BIM, IoT, AI, smart applications, and interactive dashboards. Key findings indicate that these technologies significantly enhance operational efficiency, cost savings, maintenance optimization, and decision-making. However, challenges such as high implementation costs, resistance to change, cybersecurity concerns, and integration issues persist. The study’s case studies, drawn from diverse industries including universities, underscore the practical benefits and hurdles faced during digital transformation. Recommendations include investing in comprehensive training programs, securing financial support, enhancing cybersecurity measures, developing clear strategic plans, fostering a culture of innovation, leveraging data analytics, encouraging collaboration, and advocating for supportive government policies. These recommendations aim to guide stakeholders in effectively navigating the digital landscape, aligning with Saudi Arabia’s Vision 2030 objectives to achieve operational excellence and sustainable growth in FM projects.

References

[1]  Walker, D. and Brammer, J. (2019) Implementation of CMMS in Facilities Management Projects. Journal of Facilities Management, 15, 120-134.
[2]  Eastman, C., Teicholz, P., Sacks, R. and Liston, K. (2018) BIM Handbook: A Guide to Building Information Modeling for Owners, Designers, Engineers, Contractors, and Facility Managers. 3rd Edition, John Wiley & Sons.
[3]  Gubbi, J., Buyya, R., Marusic, S. and Palaniswami, M. (2013) Internet of Things (IoT): A Vision, Architectural Elements, and Future Directions. Future Generation Computer Systems, 29, 1645-1660.
https://doi.org/10.1016/j.future.2013.01.010
[4]  Ng, J. and Yang, K. (2020) AI-Driven Predictive Maintenance in Facilities Management. Journal of Artificial Intelligence Research, 45, 333-349.
[5]  Alrubaidi, M. and Alhammadi, S.A. (2022) Investigation of Different Infill Wall Effects on Performance of Steel Frames with Shear Beam-Column Connections under Progressive Collapse. Latin American Journal of Solids and Structures, 19, e432.
https://doi.org/10.1590/1679-78256983
[6]  Green, B. and Krejci, D. (2019) Enhancing Facility Management with Smart Applications. International Journal of Facility Management, 10, 200-215.
[7]  Alrubaidi, M. and Alhammadi, S.A. (2022) Effectiveness of Masonry Infill Walls on Steel Frames with Different Beam-Column Connections under Progressive Collapse. Structures, 38, 202-224.
https://doi.org/10.1016/j.istruc.2022.02.002
[8]  Few, S. (2019) Information Dashboard Design: Displaying Data for at-a-Glance Monitoring. 2nd Edition, Analytics Press.
[9]  Eastman, C., Teicholz, P., Sacks, R. and Liston, K. (2018) BIM Adoption in Facilities Management. Journal of Construction Engineering and Management, 144, Article 04018009.
[10]  Gubbi, J., Buyya, R., Marusic, S. and Palaniswami, M. (2017) Energy Efficiency through IoT in Facilities Management. Energy Efficiency Journal, 12, 347-359.
[11]  Alrubaidi, M. and Abadel, A.A. (2023) Numerical Study on Upgrading Beam-Column Connections in Steel Framed Buildings for Progressive Collapse Mitigation. Structures, 48, 1576-1597.
https://doi.org/10.1016/j.istruc.2023.01.046
[12]  Ng, J. and Yang, K. (2020) Cost Savings with AI-Driven Predictive Maintenance. Maintenance Technology, 22, 45-52.
[13]  Green, B. and Krejci, D. (2019) Reducing Operational Delays with Mobile Apps in FM. Facility Management Journal, 17, 120-135.
[14]  Alrubaidi, M. and Alhammadi, S.A. (2022) Numerical Investigation on Progressive Collapse Mitigation of Steel Beam-Column Joint Using Steel Plates. Materials, 15, Article 7628.
https://doi.org/10.3390/ma15217628
[15]  Walker, D. and Brammer, J. (2019) Overcoming High Implementation Costs in CMMS. Maintenance and Reliability Journal, 13, 255-270.
[16]  Gubbi, J., Buyya, R., Marusic, S. and Palaniswami, M. (2017) Enhancing Security in IoT Systems for FM. Internet of Things Journal, 15, 1458-1468.
[17]  Ng, J. and Yang, K. (2020) Addressing Data Privacy in AI Implementations. Data Privacy Journal, 8, 78-89.
[18]  Green, B. and Krejci, D. (2019) Mitigating Data Breaches in Smart Applications. Cybersecurity in FM, 5, 112-124.
[19]  Few, S. (2019) Customizing Dashboards for Enhanced User Experience. User Experience Journal, 21, 167-180.
[20]  Eastman, C., Teicholz, P., Sacks, R. and Liston, K. (2018) Streamlining FM Operations with BIM. Facilities Journal, 26, 287-302.
[21]  Gubbi, J., Buyya, R., Marusic, S. and Palaniswami, M. (2017) Blockchain Integration for Secure IoT in FM. Blockchain Technology Journal, 11, 45-60.
[22]  Walker, D. and Brammer, J. (2019) Extending Asset Lifespans with CMMS. Asset Management Journal, 19, 145-159.
[23]  Eastman, C., Teicholz, P., Sacks, R. and Liston, K. (2018) Reducing Construction Delays with BIM. Construction Management Journal, 20, 380-396.
[24]  Gubbi, J., Buyya, R., Marusic, S. and Palaniswami, M. (2017) IoT for Enhanced Safety in FM. Safety Management Journal, 9, 210-225.
[25]  Ng, J. and Yang, K. (2020) Optimizing Resource Allocation with AI in FM. Resource Management Journal, 14, 130-144.
[26]  Green, B. and Krejci, D. (2019) Leveraging Edge Computing for Smart FM Applications. Edge Computing Journal, 7, 192-206.
[27]  Few, S. (2019) Continuous Updates and Customization of Dashboards. Data Visualization Journal, 18, 101-114.
[28]  Eastman, C., Teicholz, P., Sacks, R. and Liston, K. (2018) Standardizing BIM Practices for FM. Journal of Facility Management, 25, 423-438.
[29]  Gubbi, J., Buyya, R., Marusic, S. and Palaniswami, M. (2017) Infrastructure Requirements for IoT in FM. Infrastructure Journal, 13, 327-341.
[30]  Ng, J. and Yang, K. (2020) Predictive Maintenance and Cost Savings in Industrial Facilities. Industrial Management Journal, 28, 490-507.
[31]  Green, B. and Krejci, D. (2019) Real-Time Monitoring with IoT in FM. Monitoring Technology Journal, 10, 98-112.
[32]  Few, S. (2019) Data Integration Challenges in Interactive Dashboards. Data Integration Journal, 6, 145-157.
[33]  Eastman, C., Teicholz, P., Sacks, R. and Liston, K. (2018) Coordination and Communication Enhancement with BIM. Coordination Journal, 22, 511-528.
[34]  Gubbi, J., Buyya, R., Marusic, S. and Palaniswami, M. (2017) Implementing IoT in Logistics Facilities. Logistics Journal, 8, 340-356.
[35]  Ng, J. and Yang, K. (2020) Advances in AI for FM Operations. AI Research Journal, 15, 210-225.
[36]  Green, B. and Krejci, D. (2019) Enhancing Store Performance with Data Analytics. Retail Management Journal, 12, 176-189.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133